NIST 800-53
Link technical policies and their evaluation results to catalog controls. Review the source evidence, tested scope, and gaps for each assessment.
Technical control evidence
Run checks with CI/lock. Keep signed evidence. Use the platform to connect the results to the controls they support.
Technical assurance, built on execution
Remediation checks. Recovery rehearsals. Configuration tests. Capture the technical evidence that is hard to track in a GRC checklist, then map it to the controls it supports.
CI/lock runs your existing checks and captures signed results. The platform evaluates the evidence and links the result to your selected controls, including FedRAMP 20x KSIs.
Use the tools and scripts your team already trusts.
Retain the tested subject, execution context, and signer.
Give reviewers a path from the control to the actual evidence.
Restore the service and test it against your recovery objectives.
Retain the tested environment, recovery measurements, and result.
Supports review of tested recovery capabilities.
Example mappings support a control assessment. Catalog version, scope, and coverage still matter.
The full picture
Explore evidence collection, gate management, technical assurance, identity, integrations, and deployment.
Frameworks and scope
Mappings depend on catalog version, deployment, and the scope of the check. Coverage is something to inspect, not assume.
Link technical policies and their evaluation results to catalog controls. Review the source evidence, tested scope, and gaps for each assessment.
Connect signed operational tests to relevant Key Security Indicators. Recovery rehearsals, configuration checks, and remediation verification provide concrete evidence for review.
Discuss the required baseline, boundary, and evidence coverage with our team. Mappings support assessment work; they do not constitute a FedRAMP authorization.
Use technical evidence to support relevant criteria alongside your broader organizational control program. Confirm the required scope and mapping coverage with the team.
Discuss your selected control catalog, applicable scope, and technical evidence requirements. A test result supports an assessment of the corresponding practice.
Discuss the deployment architecture, control catalog, and evidence boundary your program requires before selecting a configuration.
Ask about the current mapping coverage and availability for your deployment. Organizational requirements still need their own evidence and assessment.
Discuss software provenance, vulnerability-handling evidence, and the technical records your product needs. Availability and coverage should be confirmed for your requirements.
Bring your internal requirements and technical tests. We can discuss how to connect the evidence to the controls your team needs to demonstrate.
Start with your evidence
Walk through a recovery test, a remediation check, or a requirement unique to your team.